Back in the day, MiceAge was the ultimate Disney fan site if you were looking for what was to come at the Disneyland Resort. California Adventure was a pitiful mess, and Disneyland was slowly being left to rot, one attraction after another. Site owner Al Lutz became a fan favorite for holding Disney's feet to the fire by using the media to expose the plans of mice and men.
Years later, Honor Hunter's (gotta love the name!) "Blue Sky Disney" came on line. His information was usually dead on accurate. As proof, here's a copy of his post from October 23, 2007:
Time Bombs...
"Are we there yet?"
"Are we there yet?"
"Are we there yet?"
You know the questions we get when kids become impatient about where they're
going...
We all know after hearing the rumors for the past few years that many Disney
Geeks/Fans will be asking a similar question:
"When will it be done?"
Well, I guess it's time to show you a preliminary guide to the divisions of
work to be done in "Phase One". Now, some of these could change
depending on construction delays, weather and other factors but you can pretty
much use this as a guide to the coming construction and which projects will go
before others.
I call these phases "Time Bombs"...
Weapons of creativity to fend off the mediocrity of a generic theme park. These
things have already had their timer set. Once they go off they're going to
explode these areas and the results will be a decimation of the bland and
boring with the plastering of rich, lavish theming all through the park.
These Time Bombs are set to go off at different places at different times and
the results will be nothing short of being visually stunning. Four and a half
years from now you'll walk through DCA(don't get used to that acronym) and not
realize it's the same park... sure some areas will be familiar, but overall
you'll have never been to this park before.
Shall we get started on our bombing run? Good...
Time Bomb 1
Paradise Pier and the surrounding area has been under construction since 2005
so it's had a bit of a head start. The Pier with its richly themed heavy D
ticket will be through with construction in July. Actually, it'll be done
mainly by April, but there will be tests and previews all the way through July,
which is when it is tentatively scheduled to open. The surrounding midway with
its rethemed games will be open as well. Basically everything between the
Carousel and Maliboomer will be finished by next summer. All the additions in
the pier will be installed early next year so as to not interrupt the view of
that new section. The Sun Wheel is currently scheduled to be completed around
this time as well, although construction on it may drag a bit. Mickey's Fun
Wheel should be done by the end of 2008 unless the current plans change.
Time Bomb 2
The transformation of Sunshine Plaza to Walt Disney Plaza is supposed to get
started in fall of next year. Once the temporary entrance is done expect
bulldozers to start rolling and construction to be completed on this visually
extravagant set-back to the late 20's/early 30's by late 2009 or early 2010.
The construction will probably be done in two phases with the front section
being done first and then the courtyard with its trolley, restaurants and shops
going up after that part is done.
Time Bomb 3
The retheming of this section of Paradise Pier and the absorption of Route 66
will start in late 2009 and continue through late 2010 or early 2011 to be
finished around the time of the tenth anniversary. The shops and beer garden will
layer the area in a bygone era... while "Goofy's Sky School" will
stick out, but be a much more immersive and lavishly themed coaster that
doesn't resemble the Mulholland Madness kiddie coaster of today. The Maliboomer
should be removed around this time and the work on the Orange Stinger and the
surrounding area will begin as well.
Time Bomb 4
The Little Mermaid attraction and area will start to arise when the Golden
Dreams building is removed in early 2009 and the construction of an elaborate
show building is constructed. Work on the expanded viewing area should start in
late 2008 so that the area will be available for use in late 2009 when
"Disney's World of Color" is tentatively scheduled to make its bow.
Time Bomb 5
The areas atop where Ariel's Grotto and the surrounding stores should start to
see work begin on them in early 2009. The plan is to have construction done by
the time DWOC debuts and the lower levels are supposed to get enclosed so as to
not get any paying diners wet. This area should be done by late 2009 should no
delays come up.
Time Bomb 6
The final and largest part of the expansion gets underway in late 2009 when
planning for "Cars Land" turns into overdrive. By early 2010 the area
will be a hive of activity. The construction walls and signs will point to the
great new addition that takes up 20 percent of the park and will change the
skyline and theming once done. The area around "Bugs Land" that
people see when walking by that exposes the outside of the resort (hotels,
power-lines) will disappear by the time this expansion opens up in 2012.
By the time DCA has its tenth anniversary the entire park will be remade and
look brand spanking new... the only thing that won't be open by the tenth will
be "Cars Land", but it will be ever-so present... with the
construction of those giant mesas looming overhead Disney Geeks/Fans will be
running about the new park, most likely with the new name all giddy. Peering
over their shoulder at the final jewel, the final present of "Phase One"
to be opened in the summer of 2012.
If by that fall the clicks are starting to edge up to the 9 million mark...
Iger will give the official nod to "Phase Two" and you can expect
some form of announcement at the end of that year or the beginning of 2013
talking about even more goodies. John Lasseter and Bob Weis have a few
surprises up their sleeves that are expected and at least one that will give
the faithful a reason to have faith.
A LOT of faith...
(end of article)
Now, isn't that amazing? Where is Honor and when will Blue Sky return?
On the East Coast, we thankfully have Steve over at WDWMagic and frequent poster WDW1974, an industry insider that shares the dirt on the Walt Disney World Resort.. and more worldwide. It's rarely good news these days, but at least it's news. While Universal gets ready to unveil Diagon Alley at the Studios, Disney seems content to flog a remake of Epcot's Maelstrom into a Frozen attraction while they putz around with MyMagic+. Sure, Avatar is coming to Animal Kingdom, but how much excitement is that really generating? Star Wars at the Studios will happen years from now, but in the meantime, Epcot sinks to new lows.
It will be great fun to see what the future holds for both US resorts, and one day, I'll be looking back at old posts from these insiders, reviewing their predictions.
Now about that Phase Two for DCA...
(Art copyright Blue Sky Disney.)